{"id":13968,"date":"2016-05-26T21:31:36","date_gmt":"2016-05-26T21:31:36","guid":{"rendered":"http:\/\/www.iacdrive.com\/2016\/05\/26\/ups-systems-commissioning-test-and-inspection-procedures\/"},"modified":"2016-05-26T21:31:36","modified_gmt":"2016-05-26T21:31:36","slug":"ups-systems-commissioning-test-and-inspection-procedures","status":"publish","type":"post","link":"http:\/\/iacdrive.com\/?p=13968","title":{"rendered":"UPS systems commissioning test and inspection procedures"},"content":{"rendered":"<p>The UPS systems commissioning test and inspection procedures are to conform to; <\/p>\n<p>\u2022 BS EN 50091-1:1993 &#8211; Specification for Uninterruptible Power Supplies (UPS). General and Safety Requirements, AND <\/p>\n<p>\u2022 IEC 62040-3 (Draft Edition \u2013 2) in particular the Efficiency test procedures outlined in its &#8220;Annexure-J&#8221;. <\/p>\n<p>These procedures to include: <\/p>\n<p>1. Visual Inspection: <br \/>\na. Visually inspect all equipment for signs of damage or foreign materials. <br \/>\nb. Observe the type of ventilation, the cleanliness of the room, the use of proper signs, and any other safety related factors. <\/p>\n<p>2. Mechanical Inspection: <br \/>\na. Check all the power connections for tightness. <br \/>\nb. Check all the control wiring terminations and plugs for tightness or proper seating. <\/p>\n<p>3. Electrical Pre-check: <br \/>\na. Check the DC bus for a possible short circuit. <br \/>\nb. Check input and Bypass power for proper voltages and phase rotation. <br \/>\nc. Check all lamp test functions. <\/p>\n<p>4. Initial UPS Startup: <br \/>\na. Verify that all the alarms are in a &#8220;go&#8221; condition. <br \/>\nb. Energize the UPS module and verify the proper DC, walkup, and AC phase on. <br \/>\nc. Check the DC link holding voltage, AC output voltages, and output waveforms. <br \/>\nd. Check the final DC link voltage and Inverter AC output. Adjust if required. <br \/>\ne. Check for the proper synchronization. <br \/>\nf. Check for the voltage difference between the Inverter output and the Bypass source. <br \/>\ng. Perform full-load, step-load, and battery discharge tests using supplier furnished load bank.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The UPS systems commissioning test and inspection procedures are to conform to; <\/p>\n<p>\u2022 BS EN 50091-1:1993 &#8211; Specification for Uninterruptible Power Supplies (UPS). General and Safety Requirements, AND <\/p>\n<p>\u2022 IEC 62040-3 (Draft Edition \u2013 2) in particular the Efficiency test procedures outlined in its &#8220;Annexure-J&#8221;. <\/p>\n<p>These procedures to include: <\/p>\n<p>1. Visual Inspection: <br \/>\na. Visually inspect all equipment for signs of damage or foreign materials. <br \/>\nb. Observe the type of ventilation, the cleanliness of the room, the use of proper signs, and any other safety related factors. <\/p>\n<p>2. Mechanical Inspection: <br \/>\na. Check all the power connections for tightness. <br \/>\nb. Check all the control wiring terminations and plugs for tightness or proper seating. <\/p>\n<p>3. Electrical Pre-check: <br \/>\na. Check the DC bus for a possible short circuit. <br \/>\nb. Check input and Bypass power for proper voltages and phase rotation. <br \/>\nc. Check all lamp test functions. <\/p>\n<p>4. Initial UPS Startup: <br \/>\na. Verify that all the alarms are in a &#8220;go&#8221; condition. <br \/>\nb. Energize the UPS module and verify the proper DC, walkup, and AC phase on. <br \/>\nc. Check the DC link holding voltage, AC output voltages, and output waveforms. <br \/>\nd. Check the final DC link voltage and Inverter AC output. Adjust if required. <br \/>\ne. Check for the proper synchronization. <br \/>\nf. Check for the voltage difference between the Inverter output and the Bypass source. <br \/>\ng. Perform full-load, step-load, and battery discharge tests using supplier furnished load bank.<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[67],"tags":[],"class_list":["post-13968","post","type-post","status-publish","format-standard","hentry","category-iacdrive_blog"],"_links":{"self":[{"href":"http:\/\/iacdrive.com\/index.php?rest_route=\/wp\/v2\/posts\/13968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/iacdrive.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/iacdrive.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"http:\/\/iacdrive.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13968"}],"version-history":[{"count":0,"href":"http:\/\/iacdrive.com\/index.php?rest_route=\/wp\/v2\/posts\/13968\/revisions"}],"wp:attachment":[{"href":"http:\/\/iacdrive.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/iacdrive.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13968"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/iacdrive.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}